welcome to coolimba power

Aviva Corporation Ltd is progressing the development of a 2x200MV baseload power station in the Mid West region of Western Australia. The Project will be known as the Coolimba Power Project.

Fuel for the Coolimba Power Project will be sourced from a coal deposit 20km south of Eneabba and 150km south of the port of Geraldton. The deposit has the potential to produce the lowest cost fuel for power generation in the State, and is the key to unlocking the potential of the Mid West.