Coolimba Power PERCoolimba Power Pty Ltd is proposing to develop up to 808 megawatts (MW) of electricity generation plant comprising 450MW of coal-fired base load generation and 358MW of gas fired peaking plant. The Coolimba Power Project is located 15km south of Eneabba, in the Mid West. The project requires the development of an infrastructure corridor that will include a 20km long gas pipeline lateral and an approximately 20km long 330kV electricity transmission line. Fuel for the project will be sourced from the adjacent Central West Coal deposit and either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline. Central West Coal Pty Ltd proposes to develop the Central West Coal Project located approximately 15km south-west of Eneabba. The Project is based on the mining of the 75million tonne sub-bituminous Central West coal deposit approximately 12km long and ranging from 0.27 to 2km wide.
Public Environmental ReviewCoolimba Power Pty Ltd prepared a Public Environmental Review (PER) in accordance with Western Australian Government procedures which has also been accredited by the Australian Government for the purpose of its environmental assessment. The PER describes the Coolimba Power proposal, examines the likely environmental effects and the proposed environmental management procedures associated with the proposed development. Links to download a PDF copy of the full PER or portions and appendices of the document are available below. The public submission period for the PER closed on Tuesday, 23 June 2009. Coolimba Power Project PER Downloads Note: These documents display in Adobe Acrobat PDF Format, to view the document in a new window simply click the link, otherwise to download to your computer right click the link and select "Save target As". Coolimba PER - Full (without Appendicies) (18.5mb) 2. Project Justification (0.9mb) 3. Project Description (0.9mb) 4. Existing Environment (1.3mb) 5. Stakeholder Consultation (0.8mb) 7. Biophysical Issues and Management (1.0mb) 8. Pollution Issues and Management (1.1mb) 9. Social Issues and Management (0.9mb) 10. Assessment of Commonwealth Matters of National Environmental Significance (0.8mb) 11. Summary of Environmental Management Commitments (0.8mb) 13. Acknowledgements, 14. References and 15. List of Acronyms, Abbreviations and Glossary (0.9mb)
Appendicies Appendix A Environmental Scoping Document (3.4mb) Appendix B Relevant Legislation, Policies and Guidelines (0.1mb) Appendix C Groundwater Report (4.8mb) Appendix D Draft Rehabilitation and Closure Plans (0.3mb) Appendix E Acid Sulphate Soils Assessment (47.1mb) Appendix F Surface Water Report (7.7mb) Appendix G Flora and Vegetation Report (1.4mb) Appendix H Dieback Assessment (6.2mb) Appendix I Vertebrate Fauna Report (3.9mb) Appendix J Carnaby's Cockatoo Habitat Assessment (5.2mb) Appendix K Stygofauna Survey (2.5mb) Appendix L Short Range Endemic Invertebrate Survey (10.6mb) Appendix M Social Impact Assessment (0.3mb) Appendix N Air Quality Assessment (12.4mb) Appendix O Traffic and Transport Assessment (1.4mb) Appendix P Aboriginal Heritage Survey (1.4mb) Appendix Q Draft Environmental Management Plan (0.7mb) Appendix R Noise Assessment (1.4mb) Appendix S Geochemistry Report (1.1mb) Appendix T Predicted Impacts of Ash Co-disposal on Groundwater (102.5mb)
|